Our house was originally built with electric storage heating. Along the way, one of the owners had it converted to gas central heating. The cowboy builder that did the work was more than useless. None of the pipes were lagged or clamped, and the floors were put down willy nilly so the whole of the upstairs was one giant, creaking jigsaw puzzle that would clang and bang like hell every time the heating came on. We finally decided to get that sorted.
This meant that all of the floors needed to come up, which was a pig of a job and had to be done in two steps. We had to break down all the furniture in Bean’s room and the guest bedroom, then get those rooms rebuild and re-carpeted. Then, after rebuilding all the furniture, we had to do the same thing to our bedroom and get that done, and then re-carpet the halls, stairs and landing as well.
While we were getting that done, Katy, Bean and Poley had to go to Leicester because we’d have builders coming and going all the time. It’s been hell on Katy, with all the driving and child/dog wrangling (all the while being ill). The good news is that it’s all done now, and the house is plush and quiet.
Current Mood: Giddy