We're dead on our feet. The enormity of the scope of the job we've taken on is starting to sink in. Thinking that we could ompletely repaint a 2-story 3 bedroom house in 3 days is hubris. Our schedule was particularly blown out of the water today because we realized that we'd need to give 2 coats of paint to most of the surfaces. What's not helping also is that we were supposed to have another pair of hands to help out, which has subsequently fallen off the map rather suddenly.
The house is also making its displeasure felt at being given a facelift. As I was masking walls to prep them for paint, I needed to reposition a length of tape – only to be faced with a long line of paint being stripped off the ceiling when I took it off. The paint is so old and so layered that it's falling off in chunks if you pull at it. I ended up having to cut in by hand, without taping. Results are mostly good, except for the odd oopsie that I'll need to correct. As a side note, the oopsies mostly happened at the end of the day when we both were tired, hungry and rather fed up :)
Anyway, at the end of today, we can say that the living room is done and sparkling, and we have two coats of the light shade we're putting in the bedroom and guest bedroom. What's on the menu for tomorrow is:
– putting two coats of light color in the office (2 walls)
– fixing the ceiling oopsies in all the rooms
– putting two coats of dark (1 wall)
– putting two coats of dark color in the office (2 walls)
– putting two coats of single color in the kitchen
The bathroom and the trim/baseboards have been pushed off the schedule for now, because they can be done after we've moved in with a minimum of fuss.
A long, warm shower is now called for to get rid of all the paint that has managed to make its way in the various nooks and crannies of my body.